Products
Contact Us
- Contact Person : Mr. Xiuqin Lin
- Company Name : HOLY CITY LIMITED
- Tel : 86-022-84263558
- Fax : 86-022-84263772
- Address : Tianjin,Tianjin,No2#1502 Huijin Square building, Airport Economic Zone, Dongli District,Tianjin, China
- Country/Region : China
- Zip : 300000
7ton/day Half Automatic Waste oil heating system
Product Detailed
Related Categories:Agricultural Product Stock
Breif IntroductionMake use of pyrolysis method, get rid of the water and impurity from the waste oil and recycle the fuel oil.Technical DataProduct ModelSpecifications(mm*mm)Per batchCapacity(ton)Gross weight(ton)Power(kw)PackageHLN-2200*66002.2 * 6.672814.52*40'HQProduct ModelFeeding time(hours)processing time(hours)cooling time(hours)Slag outlet time(hours)HLN-2200*66002822Product ModelReactor volumeSpecification(m)Per batch productivityPer day productivityHLN-2200-660025m³2.2*6.66TON7TONwe are sure to supply the best quality ,no pollution ,high oil yield with the best price,1-machine material:Q245R BOILER STEEL which is able to resist high temperature & high pressure & corrosion resisting and not easy to broke the reactor .if workers operate well ,machine life can be 6~8 years.2-Safety 100%:A,There will be installed safety valves in the reactor ,oil-water separator ,water- sealing system .B,Explosion-proof valves in the machine( when the pressure is too high,the valves will be open automatically,till pressure is OK.,it will be closed itself.)C,Temperature gauge and pressure gauge installed in the reactor ,oil-water separator ,water- sealing system .we can see and control the degrees easily,3-After-sale service:One year warranty( including accessories,not including human factors and easy-broken parts ),if there are quality problems under the condition buyer operates the machine according to equipment instructions,we should be unconditional to change or repair the broken parts.we provide catalyst formula free for the buyer.Fuel oil from waste oil are used in below industriesA.power plant factoryB.glass factoryC.cement factoryD.ceramic factoryE.aluminum factoryF.boiler factoryG.central heating factoryH.painting factory★ Commissioning & InstallationWe offer entire installation and commissioning service until the machine work properly. We offer three years guarantee to buyer, as buyer offer transportation international and boarding charges in local places. After three years, any problem we still will charge for buyer under a reasonable fee
Other products